BG 03 & BG 06 installation progress on 30 Nov 2014.

The ground signal disc for BG 03 during installation. This signal will control movements along the platform or main line at Boughton. A second disc (Signal BG 06) will be installed above the one shown to control movements along the loop line. Photo: David Millard 30 Nov 2014