James Coulston holding the first full length locking bar to be fitted to all 30 locking racks. 06th April 2014

James Coulston holding the first full length locking bar to be fitted to all 30 locking racks. 06th April 2014

Note the final alignment of the racks & uprights was carried out in May 2014